Vertical Integration – Capital Infrastructure Group is featured in the September edition of Trenchless Technology Magazine. Check out the full article here, and here…Read more
Capital Infrastructure Group is pleased to announce the plan that was initiated roughly 14 months ago to bring all facets of our organization under one state of the art facility is now complete. Welcome to 31 Keyes Court located in the City of Vaughan, Ontario, Canada. This 30,000 (check that number) square foot facility isRead more
The scope of Capital’s work includes trenchless rehabilitation (CIPP Lining) of an existing Sanitary Trunk Sewer, Sanitary Sewer replacement/realignment. Sanitary Maintenance hole rehabilitation, replacement and installation. Removal of existing infrastructure and reconnect works, Sewer lateral connections. Restoration works including roadway, driveway, walkway, boulevard, landscaping, trails and associated relocation and support of utilities. This projectRead more
The scope of Capital’s work includes Sanitary/Storm Trunk Sewer rehabilitation through trenchless technology (cured-in-place-pipe), Sanitary Sewer replacement, New Maintenance Hole installation, Maintenance Hole rehabilitation, Temporary Bypass pumping, Traffic Management. Restoration works including roadway, curb and gutters, sidewalks, driveway, walkway, boulevard, landscaping, trails, landscaping and planting.Read more
The scope of Capitals work includes Sanitary Trunk Sewer rehabilitation (CIPP Lining) including Slip Lining (GRP), Shaft Installation, Maintenance Hole rehabilitation, installation of new Maintenance Holes, Bypass Pumping, Traffic Management , Relocation and Support of Utilities, Environmental protection. Restoration works including roadway, driveway, walkway, boulevard and landscaping. https://www.capitalinfrastructuregroup.ca/wp-content/uploads/2020/07/Capital_InfrastructureGroup_Outlined.mp4Read more
The South Mimico STS And Maintenance Hole Rehabilitation Project involved the trenchless rehabilitation of 2 kilometers of 600mm (24”) to 900mm (36”) diameter sanitary trunk sewer utilizing cured in place pipe as well as the rehabilitation and open cut replacement of 30 maintenance holes utilizing Warren Environmental Epoxy Spray system. As most project go, theRead more
The Highland Creek STS And Maintenance Hole Rehabilitation Project involved trenchless rehabilitation of 2134mm (84”) Diameter Sanitary Sewer, up to 18m (59’) deep with multiple bends located in a densely populated residential area in Toronto’s east end. The rehabilitation method of choice for this sewer section was GRP Slip Lining. This process was chosen dueRead more
The Wilket Creek & North York Trunk Sewer Rehabilitation is one of the more diversified rehabilitation contracts currently being performed for the City of Toronto. Scope of works includes 1 kilometer of CIPP installations in diameters ranging from 675mm to 750mm, Installation of GRP Panels to create a new pipe within a pipe for anRead more
The Sunrise, Bermondsey & Dorset Park STS And Maintenance Hole Rehabilitation Project involves Cure In Place Pipe Lining of 1.9 kilometers of 450mm (18”) to 1350mm (54”) diameter sanitary & storm trunk sewer. Rehabilitation and open cut replacement of 30 maintenance holes, up to 15m (50’) deep, specialty shoring systems with dewatering and close toRead more
31 Keyes Court, Woodbridge,
Ontario L4H 4V6
Phone: 905-266-1500
Email: info@capitalinfrastructuregroup.ca